Spraying process >

    shop

Japan Paka automobile industry coating line

c275e0ba03ff664198659492dce5ca43.jpg  f4fae3f4053016a42e7f4c5acb38dccd.jpg

Basic specifications of coating equipment

1. Treated product: material of distribution board parts: MS size method: maximum 2300l * 800W * 2300mm area: maximum 8m2h / g, standard 4m2h / G2 Production capacity treatment area: 385096m2 / year number of slings: 96274hg / year 3 Transportation method P & amp; F lifting conveying interval:

*Pretreatment area:1600mm

*Electrophoresis area: 1850mm

*Electrophoresis drying area: 1300mm

*Powder coating area: 7000mm

*Powder drying area: 2500mm

*Solvent coating area: free rail manual transfer

6cd8c394c4c53dde54f93287043e023e.jpg

Process flow of PACA automotive industry coating line in Japan

  • 01 / loading and unloading area

    1. Hanging mode: manual hanging

    2. Lifting mode: automatic electric lifting

    3. Lifting speed: 5.3m/min

  • 02 / pretreatment area

    1. Hanging mode: manual hanging

    2. Lifting mode: automatic electric lifting

    3. Lifting speed: 5.3m/min

  • 03 / electrophoresis area

    1. Hanging mode: manual hanging

    2. Lifting mode: automatic electric lifting

    3. Lifting speed: 5.3m/min

  • 04 / electrophoresis drying area

    1. Hanging mode: manual hanging

    2. Lifting mode: automatic electric lifting

    3. Lifting speed: 5.3m/min

  • 05 / powder coating area

    1. Hanging mode: manual hanging

    2. Lifting mode: automatic electric lifting

    3. Lifting speed: 5.3m/min

  • 06 / powder drying area

    1. Hanging mode: manual hanging

    2. Lifting mode: automatic electric lifting

    3. Lifting speed: 5.3m/min

  • 07 / solvent coating area

    1. Hanging mode: manual hanging

    2. Lifting mode: automatic electric lifting

    3. Lifting speed: 5.3m/min