Japan Paka automobile industry coating line
Basic specifications of coating equipment
1. Treated product: material of distribution board parts: MS size method: maximum 2300l * 800W * 2300mm area: maximum 8m2h / g, standard 4m2h / G2 Production capacity treatment area: 385096m2 / year number of slings: 96274hg / year 3 Transportation method P & amp; F lifting conveying interval:
*Pretreatment area:1600mm
*Electrophoresis area: 1850mm
*Electrophoresis drying area: 1300mm
*Powder coating area: 7000mm
*Powder drying area: 2500mm
*Solvent coating area: free rail manual transfer
Process flow of PACA automotive industry coating line in Japan
01 / loading and unloading area
1. Hanging mode: manual hanging
2. Lifting mode: automatic electric lifting
3. Lifting speed: 5.3m/min
02 / pretreatment area
1. Hanging mode: manual hanging
2. Lifting mode: automatic electric lifting
3. Lifting speed: 5.3m/min
03 / electrophoresis area
1. Hanging mode: manual hanging
2. Lifting mode: automatic electric lifting
3. Lifting speed: 5.3m/min
04 / electrophoresis drying area
1. Hanging mode: manual hanging
2. Lifting mode: automatic electric lifting
3. Lifting speed: 5.3m/min
05 / powder coating area
1. Hanging mode: manual hanging
2. Lifting mode: automatic electric lifting
3. Lifting speed: 5.3m/min
06 / powder drying area
1. Hanging mode: manual hanging
2. Lifting mode: automatic electric lifting
3. Lifting speed: 5.3m/min
07 / solvent coating area
1. Hanging mode: manual hanging
2. Lifting mode: automatic electric lifting
3. Lifting speed: 5.3m/min